Gas turbine power plants

The promising trend in power engineering development is application of energy-saving technologies on the basis of gas turbine power plants, which permit essentially increasing the efficiency of organic fuel usage in the process of combined production of thermal and electric energy.
Having many years experience in design and manufacture of turbocompressor and gas-transfer gas turbine driven compressor packages the JSC “Sumy Frunze NPO” has mastered production of gas turbine power plants.

 
Gas turbine driven cogeneration plant (GTDCP-16) designed, manufactured and commissioned in the Company provides the production of 16 MW power and 21.5 Gcal/h thermal energy.   The design of combined-cycle power generation plant (CCPGP-20) became the continuation of the works in this direction. This plant comprises the gas turbine power unit (GTU) with 16 MW power and steam turbine power plant with 6 MW rated power.

The GTDCP-16 and CCPGP-20 plants can be driven by different gas turbine engines of marine and aircraft types with 16 MW power (at outside air temperature + 15°C) and maximum power of 19.2 MW (at outside air temperature –7°C and lower).
The advantages of block-container arrangement for gas turbine zone and technical decisions, traditional for heat-and-power engineering, specified the location of the electric generator and other power generating equipment in solid building are applied in the plants design. The plant can be made completely in block-container design of full factory readiness, which considerably shorten construction and assembling work period.

Main characteristics
Characteristic,
measuring unit
Value of characteristic
CCPGP - 20 GTDCP - 16
Gas-turbogenerator plant (GTP)
Generator type T20-2-U3
   - active electric power on terminals of generator
     in rated conditions, MW
16
   - rated voltage on terminals of generator, V 6300 (10500)
   - rated current frequency, Hz 50
   - nominal power factor, cos 0.8
Steam waste heat boiler  
   - outlet steam temperature, °C, no more than 380
   - outlet steam pressure, MPa 2.0
Heat recovery unit  
   - water discharge, m3/h 480
Steam turbine unit ( STU)
Steam turbine (ST)  
   - steam turbine power , MW 4.0-6.0
   - steam flow rate, t/h 32.6
   - ST inlet steam pressure, MPa 1.75
Generator type T-6-2U3
   - power electrical active on generator
     connecting terminals at nominal mode, MW
6.0
   - voltage nominal on generator connecting terminals, V 6300 ( 10500)
   - current rate nominal, Hz 50
   - power factor nominal, cos 0.8

The automatic control system (ACS) is designed for control of the whole plants’ equipment complex.

This ACS is made on the basis of "GE Fanuk" and "Saturn Data International" software and hardware complex.

The main functions of this system are the following: the plant automatic start-up, normal and emergency shut-down, automatic protection for all operation conditions, computation of design parameters values, automatic control of fuel supply and specified operation conditions keeping with compliance of required process restrictions.

At Customer’s request the automatic control system can be made on the basis of software and hardware complexes of any leading national and foreign companies.

Main   |   Production   |   Production Potentialities   |   Quality system   |   Contact us