EXHIBITIONS
for participation in 2005

¹ Exhibitions Date and place
1 "Power Engineering - 2005"
(joint exposition with "Samara Aviagas" Ltd. "Application of NK gas-turbine engines in power engineering")
8 - 11 February
Samara, Russia
2 "TUROGE 2005"
The 4th Turkish International Exhibition and Conference "Oil and Gas 2005"
28 - 30 March
Ankara, Turkey
3 "Inter Oil and Gas" March
Kiev, Ukraine
4 "10th IRAN OIL SHOW"
Iran Oil and Gas and Petrochemical Exhibition
13 - 16 April
Tehran, Iran
5 "OGU - 2005"
The 9th International Exhibition and Conference "Oil and Gas"
17 - 19 May
Tashkent, Uzbekistan
6 Chemistry, Oil and Gas-2005
The 10th International Specialized Exhibition
24 - 27 May
Minsk, Byelorussia
7 "OIL & GAS"
Exhibition of plants, equipment and technique for oil and gas exploring, developing and refining
31 May - 3 June
Sofia, Bulgaria
8 "Caspian Oil & Gas 2005"
The 12th International Caspian Oil and Gas Exhibition and Conference
7 - 10 June
Baku, Republic of Azerbaijan
9 "MIOGE - 2005"
The 8th Moscow International Oil & Gas Exhibition
21 - 24 June
Moscow, Russia
10 "Sorochinskaya Yarmarka" August
V.Sorochintsy, Ukraine
11 Chemistry - 2005
The 13th International Exhibition
5 - 9 September
Moscow, Russia
12 "Surgut. oil and gas - 2005" 27 - 30 September
Surgut, Russia
13 "KIOGE - 2005"
13th Kazakhstan International Oil and Gas Exhibition and Conference
4 - 7 October
Almaty, Kazakhstan
14 "OIL and GAS-2005" October
Kiev, Ukraine
15 "Turkmenistan Oil and Gas"
The 10th International Exhibition
November
Ashgabad,Turkmenistan
16 "Pumps. Compressors. Valves-2005"
International Forum
22 - 25 November
MVK, Moscow, Russia

December 28, 2004


In the beginning of December, 2004 JSC "Sumy Frunze NPO" was awarded international bid floated by JSC "Surgutneftegas", Russia for five Gas Turbine driven Power Plants supply.

Other bidders in this project were such well known companies as "Solar" (the USA), "Siemens" (Germany), "Kawasaki" (Japan), NPKG "Zorya-mashproekt" (Ukraine), "Nouvo Pignone" and "GE Energy - Oil and Gas" (Italy), 'Iskra-Energetika" Ltd. and JSC "Saturn NPO" (Russia).

Based on project conditions, the Bidder shall supply and commission five Gas Turbine driven Power Plants with power 24 and 36 MW (four Plants with two Turbines and total power 24 MW and one Plant with three Turbines and total power 36 MW). The Project is expected to be in full operation in year 2006.

JSC "Sumy Frunze NPO" experience in such Gas Turbine driven Power Plants design and manufacturing was one of the main reason of Project award. Several Gas Turbine driven Power Plants have been successfully operating in Sumy for four years and generating heat and electric power for Company's needs.

Main   |   Production   |   Production Potentialities   |   Quality system   |   Contact us